CONTEXT, in collaboration with CM+, provided landscape design services as part of a design and construction consortium for the 39km dual carriageway Westlink M7 Motorway, including 15 interchanges and a shared path along its entire length. The motorway corridor creates a matrix within which the Motorway, shared path and all other project built elements are embedded. Design of the shared pedestrian and cycle pathway was driven by a focus on making connections between communities and places.
Location:
Western Sydney, NSW
Client:
Abigroup Leighton Joint Venture
Duration:
2015
Team:
CM+, AbiGroup, Leightons
Photography by: Mark Merton
Suite 3.01 | 79 Myrtle Street,
Chippendale, NSW 2008
context@context.net.au
+61 2 8244 8900
Creating places that shape people’s lives and leave a
lasting legacy for communities and the environment.
Suite 3.01 | 79 Myrtle Street,
Chippendale, NSW 2008
context@context.net.au
+61 2 8244 8900
Monday — Friday 9:00am – 5:30pm
“We create enduring places for people to live in, experience
and enjoy.”