Westlink M7

Location Western Sydney
Client Abigroup Leighton Joint Venture
Year 2005

CONTEXT provided landscape design services as part of a design and construction consortium for the 39 km dual carriageway Westlink M7 Motorway, including 15 interchanges and a shared path along its entire length.

The motorway corridor creates a matrix within which the Motorway, shared path and all other project built elements are embedded. Design of the shared pedestrian and cycle pathway was driven by a focus on making connections between communities and places.

1 / 0
© Context 2017.
Site by Pictura Creative